The Llogara Tunnel opened in July 2024 and changed the Vlora-to-Himara drive, but it didn't make the old Llogara Pass obsolete the way some travel sites claim. Both routes are open in 2026; which one is faster depends on weather, traffic, time of year, and what you're willing to trade. Neither route charges a toll for now, so the decision is about time, weather and what you want to see. Here's where the toll question stands, when to use the tunnel, and when the pass is the better call.
Compare hotels, apartments, and Vrbo rentals on the map. Powered by Stay22.
Quick Facts
| Llogara Tunnel toll | None for now; the tunnel is free to use. A toll is expected, but no price or start date has been announced |
| Tunnel length | 5.9 km |
| Opened | 5 July 2024 (closed Nov 2024 for finishing works; reopened 24 May 2025) |
| Operation | 24/7 year-round under normal conditions (vs. the pass, which can close in winter) |
| Time saving vs pass | Dukat–Palasë drops from ~30 minutes to ~7 minutes; full Vlora-to-Himara time saving is typically 20-40 minutes depending on traffic |
| Speed limit in tunnel | 80 km/h |
| Heavy vehicle restriction | Heavy/tonnage vehicles have been banned through the tunnel during the summer season. Confirm before driving a truck or camper |
| What you miss | Llogara Pass viewpoint (1,027m), restaurants at the summit, the scenic descent |
| Best for | Time-pressed drives, winter trips, peak August traffic, night driving |
| Skip if | The scenic pass drive is the reason you came |
Check before you travel. The tunnel has been free to drive since it opened, but a toll is expected to be introduced. No price or start date has been announced as of October 2026; check local news or ask your rental company before you set off.
Tunnel vs Pass: Which Should You Take?
| Your situation | Take the tunnel | Take the pass |
|---|---|---|
| First time on the Albanian Riviera, daytime drive, fair weather | Yes, the pass is the experience | |
| Already done the pass once before, time pressure | Yes | |
| Driving at night | Yes (always) | |
| Winter (Nov-March) | Yes, pass can close on snow/ice | |
| Mid-August peak traffic | Yes, pass becomes a slow conga line | |
| You have a motion-sick passenger | Yes, pass switchbacks are not friendly | |
| You want to eat lamb at the summit restaurants | Yes, restaurants are pass-only | |
| Cycling / scootering | Pass, long highway tunnels in Albania are typically motor-vehicle-only; verify locally before attempting the tunnel on a bike or scooter | |
| Bad weather (rain / fog / wind) | Yes, tunnel is climate-controlled |
For the full segment-by-segment drive review (both routes), see our SH8 Vlora to Himara drive guide. For the pass specifically, see the Llogara Pass drive.
Is There a Toll on the Llogara Tunnel?
Not for now. The Llogara Tunnel is free to drive in 2026. A toll is expected to be introduced eventually, but no price or start date has been announced.
The toll question has been circling since the tunnel opened. A plan to start charging from 15 September 2025 was reported and did not go ahead, and toll figures have been floated in the Albanian press more than once since, but none has taken effect. Treat any specific price you see quoted online, including on older travel sites, as unconfirmed until a toll is actually being collected. The Wikipedia tunnel article tracks the tunnel's history.
Check before you travel. A look at local news, or a question to your rental company before you set off, settles it. If you are a heavy-vehicle driver, check the seasonal access policy as well, the tunnel has been closed to heavy tonnage during peak summer.
For the bigger toll-roads picture, see our Albania tolls and tunnel fees guide.
When the Pass Is Actually Faster
Counterintuitively, the pass can beat the tunnel in two specific situations:
-
Empty pass on a clear day with no traffic ahead of you. With the road clear and the switchbacks empty, an experienced driver can crest the pass and descend in roughly 35-40 minutes. The tunnel approach plus tunnel plus south exit is typically faster, but in this exact scenario the absolute time difference shrinks, and the pass wins on experience.
-
Tunnel closed or backed up at the approach. When the tunnel shuts for maintenance or an incident, or the approach jams (Sunday evenings in August, end-of-festival weekends), the parallel pass route remains open. Locals know this and will sometimes switch to the pass if the queue is visible from the approach.
What the Tunnel Doesn't Replace
Three things only the pass offers:
- The 1,027m summit viewpoint, full Ionian coast panorama. The single most-photographed spot on the Riviera drive.
- The flag-pine forest, wind-sculpted trees bent horizontal by decades of coastal gusts. Walk to them from the summit restaurants.
- The summit lamb restaurants. Bujtina or one of the others. Roast lamb at altitude, roughly 800-1,200 ALL per portion, view down to Dhermi while you eat.
If those matter to your trip. Take the pass at least once. The tunnel is for repeat drives, time pressure, or bad weather.
Tunnel Hours & Closures
The Llogara Tunnel operates 24/7 year-round under normal conditions. Unscheduled closures happen for:
- Maintenance, usually overnight, announced via signage at approach and on local news
- Accidents inside the tunnel, closures of 30-90 minutes are typical, longer for serious incidents
- Heavy-vehicle restrictions, the tunnel has been closed to heavy tonnage during peak summer; confirm before driving a truck or large camper
The tunnel was also fully closed from November 2024 to 24 May 2025 for finishing works, including completion of the parallel emergency tunnel and 11 cross-passages. That closure is over, but it's a useful reminder that the facility is still young and operational policy is evolving.
If the tunnel is closed and you must drive, the pass is the only short alternative until reopening. In winter when the pass is also closed, your only option is the much longer SH8 inland-bypass route through Vlora-Fier-Tepelena-Gjirokaster-Saranda (adds 3-4 hours).
US, UK, and EU Driver Notes
For US travellers: there is no close equivalent in your driving experience to the Llogara Pass. The closest mental model is California Highway 1 around Big Sur, narrow, switchbacked, dramatic views, no guardrails in places. Drive slow; let locals pass; use engine braking on descent.
For UK travellers: the pass is technically easier than your worst Scottish single-track A-road experience, but the speed and confidence of Albanian local drivers takes adjustment. Pull over and let faster cars pass, locals will overtake on blind corners; you should not match their confidence.
For German / Dutch / Nordic travellers: similar mountain-road competency to Alpine driving, but with more variable surface quality and fewer signs. The tunnel is closer to a German Autobahn tunnel in feel, fast, controlled, climate-managed.
Frequently Asked Questions
How much is the Llogara Tunnel toll in 2026?
Nothing for now. The Llogara Tunnel is free to drive in 2026. A toll is expected to be introduced eventually, but no price or start date has been announced, so treat any figure quoted online as unconfirmed and check before you travel.
Is the Llogara Tunnel open year-round?
Yes, 24/7 year-round under normal operating conditions. This is one of the tunnel's main advantages over the Llogara Pass, which can close in winter (November-March) due to snow and ice on the 1,027m summit. The tunnel was closed from November 2024 to May 2025 for completion of finishing works, but has been operational since 24 May 2025.
Llogara Tunnel vs Llogara Pass: which is faster?
The tunnel reduces the Dukat-to-Palasë segment from roughly 30 minutes to about 7 minutes. Across a full Vlora-to-Himara drive the time saving is typically 20-40 minutes depending on traffic and weather. In peak August or in poor visibility the tunnel wins by the wider margin. In a quiet shoulder-season morning the saving is smaller, and the pass offers the summit viewpoint and restaurants the tunnel skips. First-time visitors should drive the pass at least once for the experience.
Will the Llogara Tunnel get a toll?
Probably, eventually. A toll is expected, and plans to charge have been reported since 2025, but none has taken effect and no price or start date has been announced. Until a toll is introduced there is nothing to pay. Check local news or ask your rental company before you travel.
What happens if I drive over Llogara Pass instead?
Like the tunnel, it's free. It takes 20-40 minutes longer than the tunnel depending on traffic, and gives you the 1,027m summit viewpoint, the wind-sculpted flag pines, and the option to stop for roast lamb at the summit restaurants. In winter the pass can be closed (no advance warning system, you arrive and find out). For full pass detail, see our Llogara Pass drive guide.
Are bicycles or scooters allowed in the Llogara Tunnel?
Long highway tunnels in Albania are typically restricted to motor vehicles, and access policy for the Llogara Tunnel is set by the operator. Heavy-tonnage vehicles have already been restricted during the summer season. If you are travelling by bicycle or small scooter. Plan on the pass route by default and verify tunnel access locally before relying on it.
For broader driving context, see the SH8 Vlora to Himara drive guide and the Albania tolls and tunnel fees overview.



